Search

Haumarutanga rori - pakeke

Road safety - adults

The Travel Safe team work in the community to reduce accidents and improve road safety.

Young Driver Workshop

Free young driver workshops are aimed at road users aged between 16 and 24, who hold a current learner or restricted driver licence. Participants will leave with improved knowledge, confidence, and skills.

Each workshop includes:

  • A 60-minute one-on-one driving lesson with a certified instructor
  • Waka Kotahi NZTA roadworthy vehicle check (what to check to ensure your vehicle is safe and roadworthy)
  • Driver behaviour awareness (speed, impairment, restraints, distraction, and fatigue 
  • Awareness session on sharing the road with heavy vehicles

Parents/caregivers are strongly encouraged to attend but it’s not compulsory. The four-hour workshops are held during school term holidays, usually between 9am and 1pm.

Drive has everything you need to prepare for your learner, restricted and full licence tests.

Visit the Drive website

Young driver workshop

Car Restraints

Looking for support around car seat restraints? Contact one of our local car seat technicians at travelsafeschools@tauranga.govt.nzWe offer free car seat installations, checks, and will help answer any questions or concerns regarding your car restraint.

Carseat installation

Parking behaviour

Drop off and pick up are busy times that pose a safety risk at the school gate. Travel Safe help schools to communicate things like parking time limits, drop off and pick up zones, parking over the kerb and other safety risks at the school gate. We deliver an in-school parking and safety programme named Peaceful Parker, and partner with council parking officers to do school visits when requested by schools or the community.

Blindzone Workshops 

Blindzone workshops allow people to see the world from a truck driver’s point of view. Through a series of practical scenarios, participants will learn where to place themselves so they are visible to truck drivers and will leave with more awareness and confidence on the road. 

For more on Blindzone and cycling around heavy vehicles visit Share the Road.

Blindzone workshop

Be Bright, Be Safe, Be Seen

This winter visibility programme reminds cyclists, walkers, runners, and scooter riders to have lights, bright clothing, and reflective gear if they are out and about during early mornings, evenings, and at other times of low light and poor visibility. 

Whether commuting to work or school, being active for fun or fitness, or popping down to the local shops, people should take extra care and keep safe by being fully visible on roads and paths. 

All cyclists are encouraged to wear high-visibility clothing and ensure their front light, rear light and rear red reflector are all working correctly and are clean.

View the official New Zealand code for cycling for more information.
 

Related news

SH29 Tauriko Enabling Works ramping up at Cambridge Road

Construction on the SH29 Tauriko Village and Cambridge Road section of the Tauriko Enabling Works is ramping up with sheet piling underway ahead of retaining wall works on Cambridge Road.

The upgrade of the SH29/Cambridge Road intersection is a key part of the project.  It will be a much safer and more efficient intersection, including a new connection to Whiore Avenue for buses and people walking and cycling wanting to access Tauriko Business Estate, says Bruce Waugh, NZ Transport Agency Waka Kotahi (NZTA) Regional Manager – Infrastructure Delivery Waikato/Bay of Plenty (Acting).

“In order to upgrade the SH29/Cambridge Road intersection with traffic lights, we first need to build a retaining wall on Cambridge Road to ensure the road is safe and wide enough to accommodate increased traffic in the future,” says Mr Waugh.

“Work is underway to install temporary sheet piles which involves driving interlocking steel sheets into the ground to create a barrier to support excavation and resist soil and water movement. This will help to stabilise this section of Cambridge Road before work on the retaining wall can begin.

“From early January, we’ll be closing a narrow section of Cambridge Road. This requires further traffic management, and local residents, businesses and visitors should be prepared for disruption to their journeys over the construction period, particularly from Monday 6 January to early February 2025.

“This work has been scheduled to take place in January, to minimise overall disruption to the travelling public by maximising works during the school holidays.”

Cambridge Road lane closure from 6 January – early February 2025

A short section of the northbound lane on Cambridge Road, from the SH29 intersection to 563 Cambridge Road, will be closed to complete the narrower section of sheet piling. Temporary traffic management will be in place throughout the duration of these works and will include lane shifts, a northbound lane closure, reduced speed limits and mobile operations: 

  • •24/7 Cambridge Road lane closure and detour for Bethlehem-bound traffic: All SH29 Bethlehem-bound vehicles will be required to use alternative routes via SH29 Takitimu Drive Toll Road or SH29A and Cameron Road.
  • The southbound lane will remain open.
  • A 60km/h speed limit will apply on SH29 on all approaches to the intersection, and a 30km/h speed limit on the section of Cambridge Road around the work site.
  • Local residents, businesses and visitors should be prepared for moderate disruption in the area during this time.
  • For people travelling from the SH29/Cambridge Road intersection to Bethlehem town centre, the detour routes for Bethlehem-bound traffic are expected to take approximately 15 minutes to travel via SH29 Takitimu Drive Toll Road, and approximately 22 minutes via SH29A and Cameron Road.
  • Work will occur Monday to Saturday, between 7am and 6pm, to complete this work as quickly as possible.
  • Access for Cambridge Road residents from SH29 will be via the detours. We acknowledge the inconvenience this causes to residents and are committed to completing this work as quickly as possible.

Reminder: There will be stop/go traffic management on Cambridge Road tomorrow Wednesday 11 December for the relocation of a power pole between 561 and 587 Cambridge Road.

This is in preparation for a new signalised intersection with SH29.

Road users and the local community should prepare for:
 

  • Moderate traffic delays on Wednesday 11 December, between 9am to 4pm. There will be stop/go, a 30km/h temporary speed limit, and lane and shoulder closures in place on Cambridge Road (between 561 and 587).
  • Power outages are planned for the duration of this work. Impacted property owners will be notified by their power providers.

 This work is weather dependent, and dates may change.  NZTA thanks drivers, local residents and business for their patience.

 Additional information

From late January 2025, we’ll begin work on the retaining wall, which is a key step that allows us to widen the road to accommodate increased traffic and a shared path. Building the retaining wall is complex due to the location, the surrounding geography, and traffic volumes on Cambridge Road; and the construction of the 210m-long concrete wall itself with a steep gully on one side to contend with. Multiple underground services also need to be installed including power, water and fibre.

Once the retaining wall is completed, there will be a lane shift on Cambridge Road to allow intersection and drainage works on the other side of Cambridge Road to begin.

Throughout 2025, you will see the new signalised intersection start to take shape. Upgrading this intersection to a signalised intersection requires careful planning and consideration to manage the same volumes of traffic currently travelling through it. This includes undertaking work in stages and temporary road layout changes to minimise the impact of construction works on the community until the intersection is completed in 2027.

People are asked to drive with extra care through the SH29/Cambridge Road area, while people adjust to the new traffic conditions, allow extra time for their journeys and follow any signage or instructions provided by road workers.

The SH29 Tauriko Enabling Works are being delivered by NZ Transport Agency Waka Kotahi together with Tauranga City Council. Downer is delivering the construction for the project.

Image captionRender of the future SH29/ Cambridge Road intersection.
Posted: Dec 10, 2024,

Related information

Staying safe on scooters. Information about staying safe on your scooter.

Tauranga City Council, Private Bag 12022, Tauranga, 3143, New Zealand |Terms of use|Privacy statement|Site map

Back To Top