The full list of Water supply fees as at 1 July 2025.
All fees in the following tables are stated inclusive of GST, unless otherwise stated.
Water supply |
Charges |
General |
Non-metered water annual charge |
$1006.00 |
Consumption charge per m3 |
$3.87 |
Meter reading by appointment |
$52.29 |
Restrictor fee - install (domestic) |
$293.27 |
Restrictor fee - remove (domestic) |
$293.27 |
Disconnection fee (industrial/commercial) |
$403.54 |
Reconnection fee (industrial/commercial) |
$403.54 |
Backflow prevention installation |
At cost |
Contractor supplied standpipe/hydrant use |
2025/26 |
Administration cost per invoice per month |
$47.74 |
Repairs and maintenance |
Own cost |
Damage to hydrants |
Contract rate to user |
Water charge per m3 (extra ordinary hydrant use) |
$4.96 |
Non permitted hydrant use |
$1,668.70 |
Meter testing |
2025/26 |
Up to and including 25mm meters |
$375.12 |
Above 25mm to 50mm meters |
$682.03 |
Over 50mm meters |
$959.39 |
Base charge meter size (mm) |
15 |
$41.17 |
20 |
$41.17 |
25 |
$77.90 |
32 |
$77.90 |
40 |
$321.60 |
50 |
$636.52 |
80 |
$1,271.93 |
100 |
$1,565.71 |
150 |
$1,565.71 |
200 |
$1,565.71 |