The full list of Water supply fees as at 1 July 2025.
All fees in the following tables are stated inclusive of GST, unless otherwise stated.
| Water supply |
Charges |
| General |
| Non-metered water annual charge |
$1006.00 |
| Consumption charge per m3 |
$3.87 |
| Meter reading by appointment |
$52.29 |
| Restrictor fee - install (domestic) |
$293.27 |
| Restrictor fee - remove (domestic) |
$293.27 |
| Disconnection fee (industrial/commercial) |
$403.54 |
| Reconnection fee (industrial/commercial) |
$403.54 |
| Backflow prevention installation |
At cost |
| Contractor supplied standpipe/hydrant use |
2025/26 |
| Administration cost per invoice per month |
$47.74 |
| Repairs and maintenance |
Own cost |
| Damage to hydrants |
Contract rate to user |
| Water charge per m3 (extra ordinary hydrant use) |
$4.96 |
| Non permitted hydrant use |
$1,668.70 |
| Meter testing |
2025/26 |
| Up to and including 25mm meters |
$375.12 |
| Above 25mm to 50mm meters |
$682.03 |
| Over 50mm meters |
$959.39 |
| Base charge meter size (mm) |
| 15 |
$41.17 |
| 20 |
$41.17 |
| 25 |
$77.90 |
| 32 |
$77.90 |
| 40 |
$321.60 |
| 50 |
$636.52 |
| 80 |
$1,271.93 |
| 100 |
$1,565.71 |
| 150 |
$1,565.71 |
| 200 |
$1,565.71 |