Tonoa tuihonotia tētahi hononga ratonga (SCA)
If you do not immediately receive confirmation of your submission or do not receive further communications from Tauranga City Council within 5 business days following your submission, please contact us on (07) 577 7000 or sca@tauranga.govt.nz
Your session is about to expire in 2 minutes. To stay logged in, please click 'Extend Session' below.
Your session has expired due to inactivity. You will be redirected shortly to the Service Connection Application page.
We are unable to accept your service connection application until the DWA application has been received and approved. If a DWA application has not yet been submitted, please submit the application via the DWA Objective Connect portal. If a DWA application has been submitted, please submit the service connection application once the Development Works Approval has been granted. More information can be found at the following link. https://www.tauranga.govt.nz/council/services/development-works-approval-dwa
We are unable to accept your service connection application at this stage of the DWA process. Please submit your service connection application with the DWA stamped approved plans once the Development Works Approval has been granted.
Please proceed with your application and attach your DWA stamped approved plans under the 'Attach Required Documents' section.
Note: An A3 site plan, which clearly shows the location and size of each proposed connection, must accompany this application.
For further details on flow rates refer to Aus NZ Standard 3500
Your selection in this section requires the installation of a backflow prevention device. See the backflow prevention requirements section at the end of this form.
https://www.tauranga.govt.nz/our-future/council-plans/infrastructure-development-code/licensed-contractors
Please provide a Site Specific Connection Design
Please attach in the 'Attach Required Documents' section.
Note: On-site effluent treatment systems shall be designed and installed in accordance with Bay of Plenty Regional Council requirements. Ph: 0800 368 267 for further info.
Note: Trade Waste Consent is required for any Wastewater discharge from a trade activity. Contact TCC Trade Waste Officer for further details. Ph: 07 577 7000.
The vehicle crossing shall comply with IDC drawings T430, T431 and T432.
If during the course of construction, it is necessary for Council assets to be relocated, then the required work will be carried out at the owner’s expense.
Note: Existing manholes, hydrants and valve boxes may be located in new crossings, but must be re-levelled so as to be flush with the new surface. In the case of a fire hydrant, the clearance between the top of the spindle and the underside of the cover must be maintained between 100mm minimum, and 250mm maximum. This work MUST be carried out by one of Council's Licensed Contractors.
Note: An A3 site plan, which clearly shows the proposed location of the streetlight, must accompany this application.
Backflow prevention requirements:
Find out more about backflow prevention.
Read the backflow prevention fact sheet.
Allowed file extensions: .pdf, .doc, .docx, .jpg, .jpeg, .png. Maximum file size: 20 MB.
Submitting your application, please wait...
Was this information helpful?
Tauranga City Council, Private Bag 12022, Tauranga, 3143, New Zealand |Terms of use|Privacy statement|Site map