TCC are seeking to appoint a site works contractor to implement the plan for the Cameron Road Neighbourhood Reserve.
The work will include the following elements:
- Oversee installation of Junior play area with climbing net, double slide with tunnel and trampoline, and swings.
- Oversee installation of Senior play area with mega swing, construction of 3x3 basketball court.
- Natural play area with timber steppers, balance beams and rope work.
- Paths including extension of pre-existing tarmac drive to create a main path through the reserve, a gravel bush walk, and concrete footpaths.
- Some minor excavation works and drainage is required, and play equipment will have soft fall or wet pour as specified. The site works contractor is also expected to oversee the installation of pre ordered play equipment from selected suppliers. This includes ensuring site safety, liaison and coordination with various suppliers and installers and elimination of possible conflicts.
Tauranga City Council expects to release the RFT for the works late April, with works commencing no later than 01 July. Construction duration is approx. 6 weeks.