Search

T600 Wai para

T600 Wastewater

Combined Wastewater Section (14mb pdf)

(please note due to the size of the file you may have problems downloading the document)

T601 Manhole - Standard (374kb pdf)
T602 Manhole - Shallow (147kb pdf)
T603 Manhole - Ladder and Steps (156kb pdf)
T604 Manhole - Precast 1050mmØ Lid (116kb pdf)
T605 Manhole - Entry Fixing (253kb pdf)
T606 Manhole - Standard and Raised Access Detail (188kb pdf)
T607 Manhole - Inclined Access Detail (1.1mb pdf)
T608 Manhole - Internal Drop (440kb pdf)
T609 Manhole - External Drop (333kb pdf)
T610 Manhole - PE Pipe Connections - Wall Adapter and Pre-Cast Manhole (191kb pdf)
T611 Manhole - PE Pipe Connections - Stub Flange and In-Situ Base (201kb pdf)
T612 Manhole - PE Pipe Connections - Electrofusion Coupler and In-Situ Base (208kb pdf)
T613 Manhole - PE Pipe Connections - Puddle Flange and Pre-Cast Manhole (189kb pdf)
T614 Manhole - Access Detail in Carriageway (162kb pdf)
T620 Rodding Eye - Shallow < 2.5m (2.6mb pdf)
T621 Rodding Eye - Deep > 2.5m (428kb pdf)
T630 Property Connection - Standard (256kb pdf)
T631 Property Connection - Depth > 2.5m (226kb pdf)
T632 Property Connection - Within Property (143kb pdf)
T633 Property Connection - Outside Property (161kb pdf)
T634 Property Connection - Entry to Wastewater Main/Manhole (175kb pdf)
T637 Lateral Connection - Single Connection to Manhole (88kb pdf)
T638 Lateral Connection - Two or More Connections to Manhole (95kb pdf)
T639 Lateral Connection - Single Connection to Main (77kb pdf)
T640 Lateral Connection - Two Connections to Main (80kb pdf)
T641 Lateral Connection - Two Adjacent Connections to Main (77kb pdf)
T642 Lateral Connection - Rear Lot Connection (99kb pdf)
T643 Mains Connection - Saddle Connection (87kb pdf)
T651 Bedding and Backfill Details (346kb pdf)
T652 Anti-Scour Block and Trenchstop (383kb pdf)
T653 Buildings Near Public Mains (200kb pdf)
T654 Close Proximity - Retaining Wall Restrictions (156kb pdf)
T660 Pump Station - Typical Site Layout (1.6mb pdf)
T661 Pump Station - Elevation Section (424kb pdf)
T662 Pump Station - Plan Section (318kb pdf)
T663 Pump Station - Pedestal Base Plate, Pedestal Mounting, Valve Chamber and Riser Connection 9279kb pdf)
T664 Pump Station - Deflector Plate, Ladder and Plinth (130kb pdf)
T665 Pump Station - Valve Extension Spindle, Spindle Guide and Handwheel (162kb pdf)
T666 Pump Station - Cover Slab (191kb pdf)
T667 Pump Station - Frame (101kb pdf)
T668 Pump Station - Chamber Lid (135kb pdf)
T669 Pump Station - Chamber Lid Padlock and Handle (134kb pdf)
 T670 Pump Station - Rising Main Entry to Receiving Manhole (115kb pdf)
 T671 Pump Station - 25mm Water Service Connection (196kb pdf)
 T672 Pump Station - Electrical - Standard 2 Pump Stn Without Soft Starters (1 of 2) (179kb pdf)
T673 Pump Station - Electrical - Standard 2 Pump Stn Without Soft Starters (2 of 2) (349kb pdf)
T674 Pump Station - Electrical - Standard 2 Pump Stn SMC - 3 Soft Starters (1 of 2) (197kb pdf)
T675 Pump Station - Electrical - Standard 2 Pump Stn SMC - 3 Soft Starters (2 of 2) (349kb pdf)
T676 Pump Station - Electrical - Standard 2 Pump Stn IMS2 Soft Starters (1 of 2) (256kb pdf)
T677 Pump Station - Electrical - Standard 2 Pump Stn IMS2 Soft Starters (2 of 2) ( 348kb pdf)
T678 Pump Station - Electrical - Standard 2 Pump Stn ISMC - 3 Soft Starters (1 of 3) (232kb pdf)
T679 Pump Station - Electrical - Standard 2 Pump Stn ISMC - 3 Soft Starters (2 of 3) (320kb pdf)
T680 Pump Station - Electrical - Standard 2 Pump Stn ISMC - 3 Soft Starters (3 of 3) (174kb pdf)
T681 Electrical - 2 Pump Stn Mincas SMC-3 Soft Starters (1 of 2) (232kb pdf)
T682 Electrical - 2 Pump Stn Mincas SMC-3 Soft Starters (2 of 2) (351kb pdf)
T683 Pump Station - Electrical Cabinet (232kb pdf)

Tauranga City Council, Private Bag 12022, Tauranga, 3143, New Zealand |Terms of use|Privacy statement|Site map

Back To Top