Latest update: 16 October 2026

Track remediation

Great progress is being made on clearing and remediating landslide-affected areas on Te Ara Tūtanga (base) track. The remediation works on Motukauri (summit 4WD) track landslides are complete, and there is now work underway to ready the track for public use.

Watch the latest update on Te Ara Tūtanga (base) track work

Boardwalk refresh

The boardwalk outside the surf club is getting a refresh. As part of the wider programme to restore access around Mauao, the boardwalk outside the campground is being replaced after being damaged during the landslide events and subsequent recovery works. Preparation work is now underway, with construction set to begin in late October. The new boardwalk is expected to be open and ready for use by the end of November.

Survey - Share your story about Mauao

Share your connection to Mauao and what matters most to you in this short survey.

Fill out our survey

Pilot Bay boat ramp is open

ccess may be restricted or closed at short notice due to landslide risk. If conditions change, you may not be able to return to the ramp immediately

Important information on the use of Pilot Bay boat ramp

Sign up to receive safety alerts

 

Key information

  • Mauao remains closed to protect public safety.
  • Mauao is currently a high-hazard environment with 42 identified landslides: Map of the landslides and scale of these (4.8mb pdf)
  • Permanent fencing has been installed to keep people out of the affected area, as the site remains hazardous. Geotechnical engineers are continuing to assess risks surrounding several structures at the base of Mauao.
  • Mount Maunganui Beachside Holiday Park is closed until further notice.
  • Mount Hot Pools is closed until further notice.
  • A slip alert alarm system is in place at the Mount Hot Pools and Mount Maunganui Beachside Holiday Park area.
  • The Pilot Bay boat ramp is open but is located within an active landslide risk area where conditions can change quickly.
  • The Mall, Maunganui Road and Marine Parade are open to vehicles and pedestrians. Stay up to date with event road closures here.
  • In the event of a tsunami, please evacuate to Blake Park / Bay Oval.
  • A 30-metre exclusion zone around the base/shore of Mauao remains in place.

Stay up to date

Learn more about what is happening

Find out about current work underway, information about reopening, updates to the community and background information by selecting the headings below

Monday 4 May 2026 marked an important step in the beginning of the restoration work on Mauao with a formal blessing on site, enabling re-entry onto the maunga for the commencement of essential repair works onsite. The blessing was a partnership between Tauranga City Council, the Mauao Trust and Ngā Poutiriao o Mauao, reflecting the shared responsibility and kaitiakitanga of Mauao.

Watch our video of the blessing

Initial damage and safety assessments have been completed by specialist geotechnical engineers. Current work is focused on:

  • Detailed assessment of landslip locations and their severity. Understanding ongoing instability, drainage issues and future risk.
  • Identifying which areas might be remediated first and which are more complex.
  • Developing options for repair rather than simple cleanup, particularly where track structure has been lost

This work builds on the initial assessment phase and moves toward planning practical next steps.

Landslide repair work progresses

Tauranga City Council and Mauao Trust are progressing well towards a staged reopening of the tracks on Mauao. Access will not look the same as we are used to, and Council and Mauao Trust are working together to determine what this will look like.

Any decisions about reopening tracks are informed by assessment of landslide risk and the safety of visitors to Mauao. Access to the mountain will need to return gradually and carefully. Some areas will remain under active restoration and closed to public access, while others will reopen when it is safe to do so.

The remediation works on Motukauri (summit 4WD) track landslides are complete, but there is still more work to ready the track for public use. Repair work has begun on Te Ara Tūtanga (base) track. This area is complex and a high-hazard environment due the size and scale of the landslides. Work is now underway to enable access to the landslides, which includes clean-up of the track and beach areas, so remediation work can start.

Check out some before and after photos: Photos of slip repair works (846kb pdf)  

January’s severe weather event caused extensive damage to Mauao, including multiple landslides across the maunga. Council’s goal is to return Mauao to public use, but only when it is safe and sustainable to do so. 

Council is working closely with the Mauao Trust on all planning and decision-making for the mountain and surrounding areas. This partnership ensures cultural values, guardianship responsibilities and public safety are properly considered alongside technical and engineering assessments. 

Before Mauao can reopen, Council must be confident that public safety risks can be managed. This includes ensuring that: 

  • Experts are confident the risk of further slips, rockfall and track failure can be managed. 
  • Decisions are made about what remediation work is required, how complex it will be, and how it will be funded 
  • Council continues to work alongside the Mauao Trust and tangata whenua, who are key partners in decisions about the maunga. 
  • Ongoing independent reviews and investigations provide the information needed to support a safe reopening. 

Council is also considering a partial or staged reopening of the maunga, which could include some sections of the base track and summit routes reopening earlier than others. Any partial reopening would depend on safety assessments and engineering advice. Access will remain restricted until risks are acceptable.

On 21 January 2026, a state of emergency was declared across the Bay of Plenty region. Tauranga experienced extreme rainfall, with 199.3mm recorded on 21 January and a further 96.1mm on 22 January. This severe weather caused widespread damage across our city and region, including multiple landslides and damage to infrastructure. 

Mauao, our city’s treasured maunga (mountain), was particularly affected. Forty-two landslides occurred and, tragically, a large landslide above Mount Maunganui Beachside Holiday Park claimed the lives of six people. Our thoughts remain with those who lost their lives across the region on 22 January, and with their families and loved ones. The devastating impacts of this weather event will continue to be felt by our city and our people for many years to come. 

Further across Tauranga, our city experienced widespread impacts, including a major landslide at Mangatawa, localised landslides, flooding, infrastructure damage, and multiple road closures. 

Police officially stood down their recovery operation at the Mauao landslide site on 1 February 2026. Following the handover from police, the site was officially moved into a recovery phase led by the Tauranga City Council to demobilise the recovery work, assess damage and work towards the safe reopening of Mauao. 

Following the severe weather event, specialist geologists and geotechnical engineers began assessing damage on Mauao to understand what had occurred, identify safety risks, and determine the best options to address at-risk areas. Tauranga City Council continues to work in partnership with Mauao Trust on any decisions relating to the maunga. 

The Rāhui placed by Tangata Whenua over parts of Waikorire (Pilot Bay) and Hīnekite (Mount Main Beach) following January’s severe weather event has been lifted. 

Notifications - latest news

Tertiary students to spend summer learning on the job at Council

Tertiary students to spend summer learning on the job at Council

School’s out for summer for many university students, but 21 will be trading lecture halls for real-world learning with summer internships and research projects at Tauranga City Council.

School’s out for summer for many university students, but 21 will be trading lecture halls for real-world learning with summer internships and research projects at Tauranga City Council.

The group will apply what they’ve learnt at universities around New Zealand to a range of teams, including heritage and research, venues and events, and emergency management, for the next 12 weeks.

Lorena Kuchenbecker, who has recently completed her studies in planning and geography at the University of Waikato, is joining the Planning and Partnerships team.

It’s her second summer with Council, but her first as an intern after undertaking a research project last year. This time, her summer will involve monitoring and surveying how the community use and enjoy spaces such as playgrounds and boat ramps.

"It’s a well-rounded way to implement what I’ve learnt at university through working in the community. I came to know a bit more about the work council did last summer, and I’m looking forward to getting some more local government experience, and giving back too."

Four undergraduate students will be completing summer research projects. Uriaan du Plessis, from the University of Waikato, is one of them.

He grew up in Tauranga and has just completed his third year of a civil engineering degree. He will be investigating if land development (including earthworks) impacts catchment hydrology.

"Even though it feels like a steep learning curve now, I’m excited to start climbing the hill and learn more about it.

"Tauranga has been home for most of my life, so having the chance to broaden my work experience and get a good overview in my community is an attractive way to spend my summer."

Research students will be showcasing their findings in early February, at the end of the summer programme.

Marlene Herewini, Employment Pathways Lead at Tauranga City Council, says the possibilities for research students and interns are far reaching.

"Not only will they learn a lot and build strong networks, but they’ll also be able to affect change. Whether that’s within Council, or out in the community we’re all here to serve, the potential to make a huge difference in a short timeframe is there."

Councillor Hautapu Baker also offered some words of encouragement to the group on their first day, Monday 18 November.

"I started my professional career through an internship program with Westpac bank, and it was a massive eye opener. Tauranga City Council is a great place to work, so make the most of every opportunity that comes your way. Have fun, and be intentional about the relationships you build whilst here, because those connections could lead to further opportunities in the future."

Learn more about the summer programme.

Posted: Nov 22, 2024,

Tauranga City Council, Private Bag 12022, Tauranga, 3143, New Zealand |Terms of use|Privacy statement|Site map

Back To Top