Notes:
Inspection fees in excess of those allowed for in the original permit type. This may be due to the activity taking longer than anticipated, unfinished or unsatisfactory works, acting on complaints and any other costs incurred by Council related to the activity. Re-inspection is required if reinstatement of works is not satisfactory, or repairs are not undertaken within timeframe specified.
In general these works create high risk to other Road Reserve users and infrastructure as no formal approval has been granted to undertake works. Corridor Access Request applied for after works commenced onsite without consent. Fee applied in addition to the permit type relevant to the activity of works.
Double the fee to be determined depending on permit type applied
- Minor scaffolding works associated with small scale renovation or building maintenance. - Shop front fit outs / repairs / replacements. - Crane operations. - Building cleaning operations (water blasting). - Events that do not require a full road closure. - Annual Global Traffic Management plan (non-invasive works such as; surveying, sign replacement, i.e. billboards/shop frontages, inspections and kerbside collection activities). - Road Reserve occupation i.e. skip bin, shipping/storage container - Standard Vehicle Crossing installations (per IDC drawing T431) on Low Volume roads with minimal impact to traffic.
In general, these works create low risk to Road Reserve users and infrastructure. This permit type will include the cost of 1 site inspection for active works and 1 inspection for completed works.
In general these works create moderate risk to Road Reserve users and infrastructure. This permit type will include the cost of 2 site inspections for active works and 1 inspection for completed works.
- More than 2 and up to 30 calendar days duration. - More than 20m and up to 250m affected length. - Any road crossing or intrusion whether open trenched or trenchless. - Moderate inspection requirement. - Events with a full road closure up to 8 hours and not during the hours of 7am to 7pm. Note: multiple sites for Minor Works may be considered under a single application at the discretion of the Corridor Manager.
In general these works create high risk to Road Reserve users and infrastructure. This permit type will include the cost of 3 site inspections for active works and 1 inspection for completed works.